This 60,000 square-foot project for CBS included the build-out of several studios including those for KRTH, KNX, and KFWB along with new state-of-the-art newsrooms. The project’s MEP systems were all delivered on a design-build basis.
This 60,000 square-foot project for CBS included the build-out of several studios including those for KRTH, KNX, and KFWB along with new state-of-the-art newsrooms. The project’s MEP systems were all delivered on a design-build basis.
Click to view full size images.