Kress Lofts

Kress-Lofts

This rehabilitation to existing loft condominiums consisted of common-wall and partition soundproofing, floor-to-floor soundproofing, exterior window and curtain wall weatherproofing, a new roofing system, and complete pointing and re-grouting of original exterior brick. The work was done while existing tenants maintained occupancy.

Contract Services Administrative Trust Fund and Parking Structure

CSTAF

This project features the adaptive re-use of a bank operations building and included base building MEP systems and state-of-the-art interiors. The McCormick team built out 74,268 square feet of updated space for Contract Services Administration Trust Fund (CSATF) to use as a training ground for motion picture and television workers. The project included a new […]

LINQ

LINQ

A renovation of a 75,000 square foot office building sub-divided into four quadrants, two of which were built out for Amazon and one for UBER. The base building upgrades included remodeling the existing large common area bathrooms, new exterior decks, grand entrance, new exterior façades on the north and south elevations, new landscaping surrounding the […]

Angelus Temple Sanctuary

Angelus-Temple

The renovation of this sanctuary included seismic retrofit and architectural restoration. McCormick Construction managed the upgrade of the acoustical and audio/visual systems as well as the redesign of the stage. This building is listed on the National Registry of Historic Places.

Armand Hammer Museum of Art and Cultural Center

Armand-Hammer-Museum

This concrete and steel structure was built in 18 months on a fast-track program and features two levels of the museum and support facilities. There are five galleries, an auditorium, a library, book stores, and a grand courtyard. Included in the construction project was the remodel and retrofit of the first 6 levels of the […]

I.A.T.S.E. Local 728

Local-728

An extensive remodel project of an existing Red Cross facility into a state of the art union hall for the lighting workers in the film industry. The building was stripped down to half of its original wood frame and was rebuilt with structural steel and structural wood framing members.

The Barker Brothers Building

Barker-Brothers

The seismic retrofit of an 11-story, 330,000 square-foot, brick and terra cotta building, supported by a concrete and steel superstructure. Structural modifications required extensive use of full height shotcrete shear walls on two elevations of the building. The project renovation included asbestos abatement and reconstruction of 80% of the exterior façade. McCormick also completed a […]

Element LA

Element-LA

The complete structural upgrade to five existing buildings, over 12 acres, totaling over 300,000 square feet. Structural upgrades included new structural steel bracing, shortcrete strengthening of existing walls and new CMU shear walls. The project also featured the strengthening, repair, and restoration of bowtruss roof systems. A new grand breezeway was constructed to connect existing […]

Wally’s Vinoteca

Wallys

This tenant improvement project consisted of 6,000 square feet of existing retail space. The scope of work included demolition of the original interior space and seismic upgrades to the structure. Modifications were made to the bathrooms and kitchen. Additionally, new lighting and an insulated wine vault with an upgraded HVAC package was installed. Exterior upgrades were […]

Foursquare Heritage Center

Foursquare-Heritage

The renovation of the original 1920’s home of Aimee Semple McPherson, the founder of the Foursquare Church, included the structural seismic retrofit as well as the restoration of all interior finishes. The electrical fixtures were installed to match the 1920’s fixtures and track lighting was installed to highlight the millwork display cases, video equipment, draperies, […]