Harlow Sunset Las Palmas

Harlow-Sunset-Las-Palmas

New four-story, 130,000 square-foot, LEED Gold, core and shell office building with efficient floor plates and subterranean parking. The completed building features a 32,000 square foot, two-story mezzanine on the fourth floor. The parking garage features secure, VIP parking with EV charging stations connected by a dedicated crosswalk.

AFM Local 47

AFM-Local-47

This project featured the conversion of an existing two-story, 25,000 square-foot office building into the headquarters for American Federation of Musicians Local 47. The project includes eight state-of-the-art practice studios.

Nickelodeon Animation Studio and Parking Structure

Nickelodeon-Animation-Studio

A new five-story, 110,000 square-foot production building and a new five-story 450-car parking garage for Nickelodeon’s 25th Anniversary. The project includes a design-build media mesh system to display animation on the exterior of the building.

The Jim Rome Show and Office

CBS-Jim-Rome-Show

A new television and radio broadcast facility for The Jim Rome Show including meeting rooms and offices for Jim Rome and executive and administration staff.

Cumulus Radio / Westwood One

Cumulus-Radio

A renovation and addition to the 45,000 square-foot radio broadcast facility including 21 radio broadcast studios with an (STC) rating of 55. Nine of the studios were to include video and television broadcast setups. Work also included the installation of 37 private offices, 75 cubicles, new conference rooms and kitchens, the upgrade of two existing […]

CBS Radio

CBS-Radio-Infinity

This 60,000 square-foot project for CBS included the build-out of several studios including those for KRTH, KNX, and KFWB along with new state-of-the-art newsrooms. The project’s MEP systems were all delivered on a design-build basis.

I.A.T.S.E. Local 728

Local-728

An extensive remodel project of an existing Red Cross facility into a state of the art union hall for the lighting workers in the film industry. The building was stripped down to half of its original wood frame and was rebuilt with structural steel and structural wood framing members.

KROQ Radio Station

KROQ-Radio

This project consisted of the remodel for an existing radio broadcasting facility along with the addition of a new sales and office space. The remodel included design/build HVAC systems, plumbing, electrical and fire alarm / life safety systems. The work was performed in three phases without interruption to ongoing broadcast operations.

Deluxe Film Laboratories

Deluxe-Lab

A 3-story, multi-use addition and upgrade to the Deluxe film processing facility. The project included the addition of three new developer bays, three new screening rooms, and new corporate offices. All of the construction took place while keeping the existing facility in full operation.

Foto-Kem

FotoKem

Construction of a 30,000 square-foot, post-production, dubbing, editing, and duplication facility that includes silver nitrate clarifier tanks and double containment system with 24-hour monitoring devices.